Insufficient information is available as regards to the volume of wastewater generation by the Israeli settlements located in the Palestinian part of the study area. However, the volume of generated wastewater can be approximated from the settlers population (164 thousand) generating approximately 12 MCM of wastewater. No information is available as regards to wastewater treatment and reuse in these settlements. However, a high percentage of theses settlements have wastewater treatment facilities.
In the Israeli part of the study area, the volume of generated wastewater is approximately 5.5 MCM generated from the tourism industry and from residential areas. Most wastewater is collected in networks and is either treated 1.5 MCM or is openly discharged untreated into the Dead Sea.
In the Jordanian part of the study area, the smaller communities generate approximately 1.6 MCM/yr of wastewater which is directly discharged untreated into cesspits and either infiltrates into the aquifer system or the cesspits are Vacuum cleaned and the untreated wastewater is discharged into Wadis which flow to the Dead Sea. Existing and Planned Wastewater Treatment Plants
Six wastewater treatment plants are located in the study area with a total wastewater treatment capacity of 2 MCM/yr, only one of these is located in the Palestinian part of the study area; namely Al-Bireh Wastewater Treatment Plant (WWTP). Four other wastewater treatment plants are located outside the study area with the treated wastewater discharged into open Wadis that flow into the Dead Sea Basin. The Al-Karak and Madaba wastewater treatment plants are located to the east of the study area and treat approximately 1.9 MCM/yr of wastewater. The quality of the treated effluent is low and is unsuitable for agricultural purposes. However, the treated wastewater is currently being utilized either in Agriculture (Madaba WWTP) or is discharged in Wadi Karak (Karak WWTP). The other two wastewater treatment plants are located to the West of the study area and these are Ramallah Wastewater treatment plant and Hebron wastewater treatment plant. Both of which discharge very low quality treated wastewater which flow westwards and do not enter the study area.
Water and wastewater authorities in the study area are planning
to establish 14 new wastewater treatment plants in and around
the study area. Eight of which should be operational by
the year 2006, 11 by the year 2010, 14 by the year 2015 and 17
by 2020. The total volume of treated wastewater is
projected to reach 32 MCM/yr. However, the instability of
the situation along with other political and social factors has
delayed the development of almost all planned WWTPs. |
|